There aren't as many changes going on with this bathroom project. Jim has been spending all his time tiling. As of this moment the walls for the tub/shower area are completely finished, (except for the grouting) and the floor is done except one strip. Jim ran out of thin-set and had to order more.
These photos show the floor tiles in progress. Any more updates will be few and far between because we'll be waiting for the vanity and closet doors to be built by Anthony.
After the final strip is laid on the floor Jim can finish the grouting.
Another thing we are waiting for is the top for the pony wall. Then we'll get the glass door to separate the wet room from the rest of the bathroom. That top will match the vanity top. Most of what needs done next, is a waiting game.
Jim is working around the drain in this photo. Jim put tile on the drain cover so it fits right in the floor unnoticed. It's sitting to the left of the drain.
No comments:
Post a Comment