Jim has started the demolition of the basement bathroom. The first part is taking everything out and redoing the plumbing.
These two photos the best before pictures we have.
Vanity is out and the mirror ready to go. One of the problems we are having with this project is where to put the stuff we remove from these rooms and cupboards and closets. Some places are getting crowded.
There was a little closet where Jim is working that held our paint cans, and painting stuff, and most of it needed to be thrown away anyway. That space is going to be in the bathroom to fill in the notch where the door is now.
The shower is gone.
This view is from the inside of the bathroom. The closet on the left side of the photo will be narrowed just a bit.
We hired someone to come in and remove the concrete floor.
The house filter and soft water system had to come out so Jim can redo the floor drain under them. From here you can look right into the bathroom.
Starting to dig.
Perhaps those reading this blog don't need to see all these photos. They are a reference and storage place for ourselves as well.