I see that I've been about a month behind in keeping up with the basement progress. In my defense, I've been insanely busy, which me makes me too tired to do anything rational. We've been travelling quite a bit as well.
We've almost given up on the garden. It's been hot, and we've been busy, gone and tired, as afore mentioned. Jim has been able to put in some longer working days. These photos were taken before we left late in July to take Barry on his '14 year old trip' with Gramma and Papa.
On the left where the pile of tools and junk is a temporary shelf where the vanity will be. It butts up against the "pony wall", which will divide the "wet room" from the rest of the bathroom.
For those who don't know, a pony wall is a short wall in the middle of whatever. The wet room will be shut in by a glass wall and door and is where the tub and shower will be. The tub on the left the shower on the right.
The first photo is the preliminary framing up the pony wall.
I doubt that these next few photos are of interest to very many people. Jim wanted photos of what all the piping looks like before it gets covered up. It seems to me a bit convoluted mess. Jim knows what he's doing, however.
Here is a photo of Jim's organizational system.
Concrete board going up.
Niche to put things in.
Shower "turn on", since I don't know the real name.
Next, this orange stuff goes on that hold the wire that heats up the floor.
Around the drain.
Finished
Threading wire in between the bubbly bumps. That was tricky, since there was barely enough to go around. Jim had to reconfigure it a couple of times.
After this, on to vacation.
No comments:
Post a Comment