As with any project, there is always more needing done that we expect. Jim is replacing everything with PVC pipe. These are drains from upstairs. Jim took out this piece of wall, not just to facilitate the replacement, but also because the sheetrock was rotted.
Replaced floor drain., ready for concrete.
He replaced the sheet rock with water resistant kind.
The sheetrock and tile are all out and Jim's starting on removing both closets to give more room for both the bathtub and shower.
My big storage closet, going, going, ...
gone.
Side view.
Jim moved the door over a few inches to the right for more room for the vanity. Shoring up the door space to replace the header.
Finished.
Forms going down for first concrete pour. This side is for vanity and bathtub.
Marking out shower dimensions.
In between concrete pours, Jim is working on the walls.